Skip to content

Bills · 2009-2010 Regular Session

AB 416

Died at session end Official bill text Atom feed

requiring the Department of Transportation to construct, and enumerating, a certain major highway project in Wood County if certain conditions are satisfied.

  1. Introduced, stopped here
  2. Passes Assembly, not reached
  3. Passes Senate, not reached
  4. Governor signs, not reached
  5. Law, not reached

Unfamiliar terms? Glossary

What this bill does

Plain-language analysis by the nonpartisan Legislative Reference Bureau

Under current law, the Department of Transportation (DOT) administers a

major highway projects program. With limited exceptions, including an exception

for southeast Wisconsin freeway rehabilitation projects, a major highway project is

a project having a total cost of more than $5,000,000 and involving: 1) construction

of a new highway 2.5 miles or more in length; 2) reconstruction or reconditioning of

an existing highway that relocates at least 2.5 miles of the highway or adds one or

more lanes five miles or more in length to the highway; or 3) improvement of an

existing multilane, divided highway to freeway standards. Any major highway

project, unlike other highway construction projects undertaken by DOT, must

generally receive the approval of the Transportation Projects Commission (TPC) and

the legislature (generally referred to as "enumeration") before the project may be

constructed. The TPC may not recommend approval of any major highway project

prior to the completion by DOT, and review by the TPC, of a final environmental

impact statement (EIS) or environmental assessment (EA) approved by the Federal

Highway Administration (FHWA). The legislature may not enumerate any major

highway project unless the TPC has recommended approval of the project.

This bill requires DOT to commence, in the 2009-11 fiscal biennium, the

preparation of an EIS or EA, as applicable, for a project involving the construction

of a new bridge across the Wisconsin River and associated highway connecting CTH

"Z" to STH 54/73 in Wood County. DOT must construct this project if: 1) DOT's final

EIS or EA for the project is approved by the FHWA by a certain date; and 2) there

are sufficient funds available in DOT's federal funds and local funds appropriations

for major highway projects to fully fund construction of the project. Upon

construction, the bridge and highway that are the subject of the project become part

of the state trunk highway system.

What it would cost

Fiscal estimates filed by state agencies, as official PDFs

Sponsors

Introduced by: Molepske Jr. (D) , Schneider (D) , Vruwink (D)

1 cosponsors

Lassa (D)

Full history

  1. Sep 10, 2009 · Assembly

    Introduced by Representatives Schneider, Vruwink and Molepske Jr.;Cosponsored by Senator Lassa

  2. Sep 10, 2009 · Assembly

    Read first time and referred to committee on Transportation

  3. Oct 28, 2009 · Assembly

    Fiscal estimate received

  4. Apr 28, 2010 · Assembly

    Failed to pass pursuant to Senate Joint Resolution 1