Bills · 2009-2010 Regular Session
allowing electric utilities and retail electric cooperatives to include energy derived from garbage and certain waste in satisfying renewable portfolio standards.
- Introduced, stopped here
- Passes Assembly, not reached
- Passes Senate, not reached
- Governor signs, not reached
- Law, not reached
Unfamiliar terms? Glossary
What this bill does
Plain-language analysis by the nonpartisan Legislative Reference Bureau
Under current law, an electric utility or retail electric cooperative is subject to
certain requirements for ensuring that, in a given year, a specified percentage of the
electricity that the utility or cooperative sells to retail customers is derived from
renewable resources. Such requirements are commonly referred to as renewable
portfolio standards. Current law defines "renewable resource" as an electrical
energy source that derives energy from specified sources, including biomass.
Current law defines "biomass" as a source that derives energy from any of the
following: 1) wood or plant material or residue; 2) biological waste; 3) crops grown for
use as an electrical energy source; or 4) landfill gases. However, except for certain
refuse-derived fuel used in a facility that was in service before January 1, 1998,
current law excludes garbage and nonvegetation-based industrial, commercial, and
household waste from the definition of "biomass." As a result, a utility or cooperative
may not include electricity derived from garbage and such waste in determining
whether the utility or cooperative has satisfied renewable portfolio standards.
This bill changes the definition of "biomass" so that it includes, rather than
excludes, garbage and such waste. As a result, a utility or cooperative may include
electricity derived from garbage and such waste in determining whether the utility
or cooperative has satisfied renewable portfolio standards.
What it would cost
Fiscal estimates filed by state agencies, as official PDFs
Sponsors
Full history
- Feb 24, 2009 · Assembly
Introduced by Representatives Hubler, Soletski, Ziegelbauer, Berceau, Jorgensen, Wood, Montgomery, Petrowski, A. Ott, Gunderson, Townsend, Mursau and Ballweg;Cosponsored by Senators Jauch, Plale and Schultz
- Feb 24, 2009 · Assembly
Read first time and referred to committee on Energy and Utilities
- Mar 10, 2009 · Assembly
Fiscal estimate received
- Apr 28, 2010 · Assembly
Failed to pass pursuant to Senate Joint Resolution 1