Regulation of ferrous metallic mining and related activities, making an appropriation, and providing penalties

Topics: Flood plain zoning, Mine and mining, Natural Resources, Department of: Environmental protection, Shoreland zoning, Water: Pollution, Waterways and water power, Wells, Wetland

Passed the Assembly, then stopped

The Assembly passed it on Jan 26, 2012, but the Senate never voted on it. A bill has to ⁠. To try again, a lawmaker would have to start a new bill.

  1. Introduced, passed

    Dec 14, 2011

  2. Committee, passed

    Approved

  3. Assembly vote, passed

    Passed Jan 26, 2012

  4. Senate vote, stopped here

    Stopped here. The Senate never voted on it.

  5. Governor, not reached

  6. Law, not reached

Latest entry in the official record, Mar 23, 2012: “Failed to concur in pursuant to ⁠”

Read the bill

Following saves it on this device. New actions show on your Following page. You can also get updates in a feed reader.

What it would have done

Summary by the , the Legislature's nonpartisan drafting office. It's their wording, not ours.

Overview Under current law, the Department of Natural Resources (DNR) regulates mining for metallic minerals. The laws under which DNR regulates metallic mining apply to mining for ferrous minerals (iron) and mining for nonferrous minerals, such as copper or zinc.

This bill creates new statutes for regulating iron mining and modifies the current laws regulating metallic mining so that they cover only mining for nonferrous minerals.

Read the full summary

Under current law, a person who proposes to mine for metallic minerals must obtain a mining permit and any other permit, license, certification, or other authorization (approval) that is required under the environmental and natural resources laws, other than the mining laws, for example, wastewater discharge permits, high capacity well approvals, and water quality certifications for wetlands.

Under the bill, a person who proposes to mine for iron ore must obtain an iron mining permit. The person must obtain some of the approvals under other environmental and natural resources laws, for example, wastewater discharge permits, but the bill provides new approvals in lieu of some current approvals, for example, high capacity well approvals and water quality certifications for wetlands.

The standards and procedures for granting, and the requirements related to, an iron mining permit and the other new approvals differ in some respects from the standards, procedures, and requirements under current law, as described below.

Current law requires DNR to promulgate rules specifying standards for metallic mining and for the reclamation of mining sites. The rules relating to mining must contain standards for grading and stabilization, backfilling, vegetative cover, prevention of pollution resulting from leaching of waste materials, and prevention of significant environmental pollution. The rules relating to reclamation must contain provisions for disposal of wastes in disposal facilities licensed under the solid waste laws or otherwise in an environmentally sound manner, for management of runoff so as to prevent soil erosion, flooding, and water pollution, and for minimization of disturbance to wetlands. DNR has promulgated rules on these matters.

The bill places standards for iron mining and for the reclamation of iron mining sites in the statutes, rather than requiring rule-making. The standards in the bill are similar in many respects to DNR's current rules and are less stringent in other respects.

Application for mining permit Under current law, a person who intends to apply for a permit for mining for metallic ore must notify DNR before collecting data intended to be used to support the application. DNR is required to provide public notice when it receives such a notification. After considering public comments, DNR must tell the person who filed the notice of intent what information DNR believes is needed to support an application for a mining permit. The person must submit the information as soon as it is in final form.

This bill requires a person who is contemplating a mining project to provide DNR with a general description of the proposed mining project. The description must include a description of the mining site, including the nature, extent, and final configuration of the proposed excavation and mining site and certain other information including a map showing the boundaries of the area of land that will be affected by the mining project and the names of each owner of the mining site. The bill requires the person to include this information with the bulk sampling plan, described below, or if the person does not file a bulk sampling plan, with the person's notification to DNR of the person's intent to apply for an iron mining permit. The bill requires DNR to conduct a public informational hearing on a proposed mining project after receiving the general description, either as part of the hearing on approvals required for bulk sampling or, if there is no such hearing, as a separate hearing.

This bill requires a person who intends to apply for an iron mining permit to notify DNR of the intention to file the application and requires DNR to meet with the applicant to make a preliminary assessment of the project's scope, to make an analysis of alternatives, to identify potential interested persons, and to ensure that the person intending to apply for an iron mining permit is aware of the approvals that the person may be required to obtain. DNR must also ensure that the person is aware of the requirements for submission of an environmental impact report and about the information DNR will require to enable it to process the application for the mining permit in a timely manner.

After the meeting, DNR must provide to the applicant any available information relevant to the potential impact of the project on threatened or endangered species and historic or cultural resources and any other information relevant to impacts that are required to be considered in the environmental impact statement.

Under current law, a person who wishes to obtain a permit for metallic mining must submit an application to DNR that includes a mining plan, a reclamation plan, information about the owners of the mining site, and information related to the failure to reclaim mining sites and to any criminal convictions for violations of environmental laws in the course of mining by persons involved in the proposed mining. The application must also include evidence that the applicant has applied for necessary approvals under applicable zoning ordinances and for any approvals issued by DNR that are necessary to conduct the mining, such as air pollution permits and wastewater discharge permits.

This bill includes similar provisions for the application for an iron mining permit, except that the applicant may provide evidence that the applicant will apply, rather than has applied, for necessary zoning approvals and other approvals issued by DNR.

The required content of the mining plan for iron mining under the bill is similar to that required under current statutes and DNR rules. The required content of the reclamation plan for iron mining is also similar to that required under current law.

DNR's current rules require the applicant for a metallic mining permit to show that the mining and reclamation will comply with specified minimum standards.

The bill requires showings by the applicant for an iron mining permit that differ in some ways from DNR's rules. For example, the rules require a demonstration that water runoff from the mining site will be managed so as to prevent soil erosion to the extent practicable, flooding, damage to agricultural lands or livestock, damage to wild animals, pollution of ground or surface waters, damage to public health, and threats to public safety. The bill requires a showing that water runoff from an iron mining site will be managed in compliance with any approval that regulates construction site erosion control or storm water management.

Permitting process Environmental impact statement Current law requires DNR to prepare an environmental impact statement (EIS) for every proposed metallic mine. An EIS contains detailed information about the environmental impact of a proposed project, including any adverse environmental effects that cannot be avoided if the proposal is implemented, alternatives to the proposed project, the beneficial aspects of the proposal, and the economic advantages and disadvantages of the proposal. For a metallic mining project, current law requires a description of significant long-term and short-term impacts, including impacts after the mining has ended, on tourism, employment, schools, social services, the tax base, the local economy, and "other significant factors."

This bill requires DNR to prepare an EIS for every proposed iron mine. The bill requires DNR to include a description of significant impacts on most of the same matters as under current metallic mining law.

Under current law, when a person applies for a permit or other approval for which DNR is required to complete an EIS, DNR is generally authorized to require the applicant to prepare an environmental impact report (EIR) that discloses environmental impacts of the proposed project to assist DNR in preparing the EIS.

Current law authorizes DNR to enter into an agreement with a person considering applying to DNR for approval of a project that is large, complex, or environmentally sensitive to provide preapplication services necessary to evaluate the environmental impact of the project and to expedite the anticipated preparation of an EIS for the project.

The bill requires the applicant for a mining permit to prepare an EIR.

The bill requires the applicant for a mining permit to submit the EIR with the application for the mining permit.

Current law authorizes DNR to conduct the processes related to an EIS jointly with other agencies who have responsibilities related to a proposed project.

The bill requires DNR to conduct its environmental review process for a proposed iron mine jointly with other state agencies and requires the preparation of one joint EIS. The bill requires DNR to conduct its environmental review process jointly with any federal or local agency that consents to a joint process.

Current law requires DNR to hold at least one informational meeting on a preliminary environmental report for a mining project before it issues the EIS. This bill does not require such an informational meeting.

Mining hearing Current law requires DNR to hold a hearing on an application for a metallic mining permit. The hearing includes both a contested case hearing, with testimony under oath and the opportunity for cross-examination, and a public informational hearing. The law requires that the hearing cover the EIS and cover all other approvals issued by DNR that are required for the mining project, to the extent possible. Under current law, the provisions related to notice, hearing, and comment in the metallic mining law apply to any other needed approval, unless the applicant fails to make an application for an approval in time for it to be considered at the hearing on the mining permit.

This bill requires DNR to hold a public informational hearing for a proposed iron mining project. The hearing does not include a contested case hearing. The hearing must cover the mining permit, the EIS, and all other approvals issued by DNR that are required for the mining project, unless the application for an approval is filed too late to allow the approval to be considered at the mining hearing. Under the bill, the provisions related to notice, hearing, and comment in the iron mining law apply to any other needed approval.

Deadlines; automatic approval Current law does not specify a time, after the application for a mining permit is filed, within which DNR must act on a metallic mining permit application. It does require the mining hearing to be held between 120 days and 180 days after DNR issues the EIS and requires DNR to act on the permit within 90 days after the completion of the record for the public hearing.

The bill requires DNR to act on an application for an iron mining permit no more than 360 days after the application is considered to be complete. Under the bill, if the applicant submits the application for another approval within 60 days after the application for the mining permit is considered to be complete, DNR must also act on the application for that approval by the 360-day deadline. If the applicant files the application for another approval more than 60 days after the application for the mining permit is considered to be complete, the deadline for DNR's action on the approval is extended by the number of days the application is late.

If DNR does not act within the deadline for acting on the application for an iron mining permit, the application is automatically approved.

Under the bill, the application for a mining permit is considered to be complete on the 30th day after DNR receives it, unless, before that day DNR provides the applicant with written notification that the application does not include a mining plan, reclamation plan, or waste site feasibility study and plan of operation that contain the types of information required under the bill or that the applicant has not submitted an EIR. DNR may not consider the quality of the information provided in determining whether the application is complete.

The bill authorizes DNR to request additional information needed to process the application for a mining permit after the application is considered to be complete, but it may not delay the determination that the application is complete based on a request for additional information.

Grant or denial of mining permit Grounds for denial Current law requires DNR to deny an application for a metallic mining permit for a proposed surface mine if the site is unsuitable for surface mining. A site is unsuitable for surface mining if the surface mining may reasonably be expected to destroy or damage either: 1) habitats required for the survival of endangered species of vegetation or wildlife that cannot be firmly reestablished elsewhere; or 2) unique features of the land, as determined by state or federal designation, as, for example, wilderness areas, national or state parks, archaeological areas, and other lands of a type specified by DNR by rule, as unique or unsuitable for surface mining. DNR has designated more than 150 specific scientific areas for the purposes of the determination of unsuitability.

This bill requires DNR to deny an application for an iron mining permit under the same standards for unsuitability as under current law, except that archaeological areas and other areas designated by DNR as being unique or unsuitable for surface mining are not considered for the purposes of determining unsuitability.

Current law requires DNR to deny an application for a mining permit if the mining operation is reasonably expected to cause any of the following: 1) hazards resulting in irreparable damage to specified kinds of structures, such as residences, schools, or commercial buildings, to public roads, or to other public property designated by DNR by rule, if the damage cannot be prevented under the mining laws, avoided by removal from the area of hazard, or mitigated by purchase or by obtaining the consent of the owner; 2) irreparable environmental damage to lake or stream bodies despite adherence to the metallic mining laws, unless DNR has authorized the activity that causes the damage; 3) landslides or substantial deposition in stream or lake beds that cannot be feasibly prevented; or 4) the destruction or filling in of a lake bed.

The bill requires DNR to deny an application for an iron mining permit if the mining operation is reasonably expected to cause any of the following: 1) hazards resulting in irreparable damage to specified kinds of structures, such as residences, schools, or commercial buildings, or to public roads, but not to other public property designated by DNR by rule, if the damage cannot be prevented under the mining laws, avoided by removal from the area of hazard, or mitigated by purchase or by obtaining the consent of the owner; or 2) irreparable environmental damage to lake or stream bodies despite adherence to the metallic mining laws, unless DNR has authorized the activity that causes the damage. As to the bases described in 3) or 4) above the bill requires DNR to deny the application unless the activity or occurrence is authorized by DNR under an applicable approval such as a wetland water quality certification, or a permit for a navigable water activity.

As under the current metallic mining laws, the bill requires DNR to deny a mining permit if the applicant has violated and continues to fail to comply with this state's mining laws. As also provided under current metallic mining law, the bill contains requirements for the denial of an iron mining permit based on the failure to reclaim mining sites and based on criminal convictions for violations of environmental laws in the course of mining in the United States by persons involved in the proposed iron mining.

Standards for approval Down Down /2011/related/proposals/ab426 true proposaltext /2011/related/proposals/ab426 proposaltext/2011/REG/AB426 proposaltext/2011/REG/AB426 section true Menu » 2011 » Related Documents » Proposal Text » AB426: Bill Text × Details for PDF view Link (Permanent link) Bookmark this location View toggle Go to top of document Search in this chapter Search in this section Search in this agency Search in this chapter group Search in this chapter Search in this section Cross references for section Acts affecting this section References to this 1970 Statutes Annotations Appellate Court Citations Administrative Code Index Reference lines Clear highlighting $(document).ready(function () {

$('[data-toggle=tooltip]').tooltip({ container: 'body' });

});

Who's behind it

3 lawmakers are its ⁠. 3 have no party on record.

2 more lawmakers ⁠.

See all 5 names

Authors (3)

  • Committee on Jobs
  • Economy
  • Small Business

Signed on in support (2)

  • August, Ballweg, Bernier, Bies, Brooks, Craig, Endsley, Farrow, J. Fitzgerald, Honadel, Jacque, Kapenga, Kaufert, Kerkman, Kestell, Kleefisch, Klenke, Knilans, Knodl, Knudson, Kooyenga, Kramer, Krug, Kuglitsch, T. Larson, LeMahieu, Litjens, Loudenbeck, Marklein, Meyer, Mursau, Murtha, Nass, Nerison, Nygren, A. Ott, J. Ott, Petersen, Petrowski, Petryk, Pridemore, Ripp and Rivard
  • Severson, Spanbauer, Steineke, Stone, Strachota, Stroebel, Suder, Tauchen, Thiesfeldt, Tiffany, Tranel, Van Roy, Vos, Weininger, Williams and Wynn

What it would cost

State agencies filed a . Each opens as a PDF from the Legislature.

Versions and amendments

Every text the Legislature printed for this bill, including proposed changes. Each opens on the Legislature's site.

How lawmakers voted

There were 8 votes on this bill.

Assembly Committee on Jobs vote on an amendment

Passed, 9 to 5 · Jan 24, 2012

No member-by-member record exists for this vote. Committee votes and some older sessions record totals only.

Official motion: “Report Assembly Substitute Amendment 1 adoption recommended by committee on Jobs, Economy and Small Business, Ayes 9, Noes 5”. Official record · This vote on its own page

Assembly vote on an amendment

Passed, 59 to 37 · Jan 26, 2012

No member-by-member record exists for this vote. Committee votes and some older sessions record totals only.

Official motion: “Assembly substitute amendment 1 adopted, Ayes 59, Noes 37”. Official record · This vote on its own page

Assembly vote on an amendment

Passed, 60 to 36 · Jan 26, 2012

No member-by-member record exists for this vote. Committee votes and some older sessions record totals only.

Official motion: “Assembly substitute amendment 2 laid on table, Ayes 60, Noes 36”. Official record · This vote on its own page

Assembly vote to pass it

Passed, 59 to 36 · Jan 26, 2012 · 2 didn't vote

See how each of the 97 representatives voted

D: Democrat, I: Independent, R: Republican

Yes (59)

Didn't vote (2)

Official motion: “Read a third time and passed, Ayes 59, Noes 36, Paired 2”. Official record · This vote on its own page

Joint Committee on Finance vote on an amendment

Passed, 16 to 0 · Mar 5, 2012

No member-by-member record exists for this vote. Committee votes and some older sessions record totals only.

Official motion: “Report introduction of Senate Substitute Amendment 1 recommended by joint committee on Finance, Ayes 16, Noes 0 by joint committee on Finance”. Official record · This vote on its own page

Joint Committee on Finance vote on an amendment

Passed, 16 to 0 · Mar 5, 2012

No member-by-member record exists for this vote. Committee votes and some older sessions record totals only.

Official motion: “Report introduction of Senate Substitute Amendment 2 recommended by joint committee on Finance, Ayes 16, Noes 0”. Official record · This vote on its own page

Senate vote on an amendment

Passed, 17 to 16 · Mar 6, 2012

No member-by-member record exists for this vote. Committee votes and some older sessions record totals only.

Official motion: “Senate substitute amendment 2 rejected, Ayes 17, Noes 16”. Official record · This vote on its own page

Senate vote

Passed, 33 to 0 · Mar 6, 2012

No member-by-member record exists for this vote. Committee votes and some older sessions record totals only.

Official motion: “Referred to committee on Senate Organization, Ayes 33, Noes 0”. Official record · This vote on its own page

What happened

  1. Mar 23, 2012

    The session ended, and the bill died with it.

  2. Mar 13, 2012

    Sent to the Senate Committee on Judiciary, Utilities, Commerce, and Government Operations,.

  3. Mar 6, 2012

    Sent to the Senate Committee on Senate Organization, Ayes 33, Noes 0.

  4. Mar 5, 2012

    The committee voted to recommend passing it, 12 to 4.

  5. Mar 5, 2012

    “Report adoption of Senate Substitute Amendment 2 recommended by joint committee on Finance, Ayes 12, Noes 4” (the official wording)

  6. Mar 5, 2012

    “Report introduction of Senate Substitute Amendment 2 recommended by joint committee on Finance, Ayes 16, Noes 0” (the official wording)

  7. Mar 5, 2012

    “Report introduction of Senate Substitute Amendment 1 recommended by joint committee on Finance, Ayes 16, Noes 0 by joint committee on Finance” (the official wording)

  8. Feb 17, 2012

    The committee held a public hearing.

  9. Feb 15, 2012

    Sent to the Joint Committee on Finance,.

  10. Jan 31, 2012

    Sent to the Senate Committee on select committee on Mining Jobs.

  11. Jan 27, 2012

    The Senate received it.

  12. Jan 26, 2012

    The Assembly passed it, 59 to 36.

  13. Jan 26, 2012

    The Assembly adopted it, 59 to 37.

  14. Jan 26, 2012

    59 more representatives signed on in support.

  15. Jan 26, 2012

    The Assembly adopted it.

  16. Jan 24, 2012

    Sent to the Assembly Committee on Rules.

  17. Jan 24, 2012

    The committee voted to recommend passing it, 9 to 5.

  18. Jan 19, 2012

    A state agency sent in its estimate of the cost.

  19. Jan 11, 2012

    The committee held a public hearing.

  20. Jan 6, 2012

    A state agency sent in its estimate of the cost.

  21. Dec 14, 2011

    The committee held a public hearing.

  22. Dec 14, 2011

    Sent to the Assembly Committee on Jobs, Economy and Small Business.

  23. Dec 14, 2011

    Introduced in the Assembly.

See the official record, word for word
  1. Dec 14, 2011 · Assembly

    Introduced by committee on Jobs, Economy and Small Business

  2. Dec 14, 2011 · Assembly

    Read first time and referred to committee on Jobs, Economy and Small Business

  3. Dec 14, 2011 · Assembly

    Public hearing held

  4. Jan 6, 2012 · Assembly

    Fiscal estimate received

  5. Jan 11, 2012 · Assembly

    Public hearing held

  6. Jan 19, 2012 · Assembly

    Fiscal estimate received

  7. Jan 20, 2012 · Assembly

    Assembly amendment 1 offered by Representatives Williams and Kuglitsch

  8. Jan 20, 2012 · Assembly

    Assembly amendment 2 offered by Representative Williams

  9. Jan 20, 2012 · Assembly

    Assembly amendment 3 offered by Representative Williams

  10. Jan 20, 2012 · Assembly

    Assembly amendment 4 offered by Representative Williams

  11. Jan 20, 2012 · Assembly

    Assembly amendment 5 offered by Representatives Williams and Kuglitsch

  12. Jan 20, 2012 · Assembly

    Assembly amendment 6 offered by Representatives Williams and Kuglitsch

  13. Jan 20, 2012 · Assembly

    Assembly amendment 7 offered by Representative Williams

  14. Jan 20, 2012 · Assembly

    Assembly amendment 8 offered by Representative Williams

  15. Jan 20, 2012 · Assembly

    LRB correction

  16. Jan 23, 2012 · Assembly

    Assembly substitute amendment 1 offered by Representative Williams

  17. Jan 24, 2012 · Assembly

    Executive action taken

  18. Jan 24, 2012 · Assembly

    Report Assembly Substitute Amendment 1 adoption recommended by committee on Jobs, Economy and Small Business, Ayes 9, Noes 5

  19. Jan 24, 2012 · Assembly

    Report passage as amended recommended by committee on Jobs, Economy and Small Business, Ayes 9, Noes 5

  20. Jan 24, 2012 · Assembly

    Referred to committee on Rules

  21. Jan 24, 2012 · Assembly

    Placed on calendar 1-26-2012 by committee on Rules

  22. Jan 26, 2012 · Assembly

    Read a second time

  23. Jan 26, 2012 · Assembly

    Assembly substitute amendment 2 offered by Representative Bewley

  24. Jan 26, 2012 · Assembly

    Assembly substitute amendment 2 laid on table, Ayes 60, Noes 36

  25. Jan 26, 2012 · Assembly

    Assembly amendment 1 to Assembly substitute amendment 1 offered by Representatives Klenke and Kuglitsch

  26. Jan 26, 2012 · Assembly

    Assembly amendment 1 to Assembly substitute amendment 1 adopted

  27. Jan 26, 2012 · Assembly

    Representatives August, Ballweg, Bernier, Bies, Brooks, Craig, Endsley, Farrow, J. Fitzgerald, Honadel, Jacque, Kapenga, Kaufert, Kerkman, Kestell, Kleefisch, Klenke, Knilans, Knodl, Knudson, Kooyenga, Kramer, Krug, Kuglitsch, T. Larson, LeMahieu, Litjens, Loudenbeck, Marklein, Meyer, Mursau, Murtha, Nass, Nerison, Nygren, A. Ott, J. Ott, Petersen, Petrowski, Petryk, Pridemore, Ripp and Rivard added as coauthors

  28. Jan 26, 2012 · Assembly

    Representatives Severson, Spanbauer, Steineke, Stone, Strachota, Stroebel, Suder, Tauchen, Thiesfeldt, Tiffany, Tranel, Van Roy, Vos, Weininger, Williams and Wynn added as coauthors

  29. Jan 26, 2012 · Assembly

    Assembly substitute amendment 1 adopted, Ayes 59, Noes 37

  30. Jan 26, 2012 · Assembly

    Ordered to a third reading

  31. Jan 26, 2012 · Assembly

    Rules suspended

  32. Jan 26, 2012 · Assembly

    Read a third time and passed, Ayes 59, Noes 36, Paired 2

  33. Jan 26, 2012 · Assembly

    Ordered immediately messaged

  34. Jan 27, 2012 · Senate

    Received from Assembly

  35. Jan 31, 2012 · Senate

    Read first time and referred to select committee on Mining Jobs

  36. Feb 8, 2012 · Senate

    LRB correction

  37. Feb 8, 2012 · Senate

    LRB correction

  38. Feb 15, 2012 · Senate

    Withdrawn from Senate select committee on Mining Jobs and rereferred to joint committee on Finance, pursuant to Senate Rule 46 (2)(c)

  39. Feb 17, 2012 · Senate

    Public hearing held

  40. Mar 2, 2012 · Senate

    LRB correction

  41. Mar 5, 2012 · Senate

    Executive action taken

  42. Mar 5, 2012 · Senate

    Report introduction of Senate Substitute Amendment 1 recommended by joint committee on Finance, Ayes 16, Noes 0 by joint committee on Finance

  43. Mar 5, 2012 · Senate

    Report introduction of Senate Substitute Amendment 2 recommended by joint committee on Finance, Ayes 16, Noes 0

  44. Mar 5, 2012 · Senate

    Report adoption of Senate Substitute Amendment 2 recommended by joint committee on Finance, Ayes 12, Noes 4

  45. Mar 5, 2012 · Senate

    Report passage as amended recommended by joint committee on Finance, Ayes 12, Noes 4

  46. Mar 5, 2012 · Senate

    Available for scheduling

  47. Mar 5, 2012 · Senate

    Placed on calendar 3-6-2012 and made a special order of business at 1:31 P.M. by committee on Senate Organization, pursuant to Senate Rule 17 (2)

  48. Mar 6, 2012 · Senate

    LRB correction

  49. Mar 6, 2012 · Senate

    Read a second time

  50. Mar 6, 2012 · Senate

    Senate substitute amendment 2 rejected, Ayes 17, Noes 16

  51. Mar 6, 2012 · Senate

    Senate substitute amendment 3 offered by Senators Jauch, Schultz, King, Holperin, Hansen, Erpenbach, T. Cullen, C. Larson, Wirch, S. Coggs, Taylor, Vinehout, Lassa and Carpenter

  52. Mar 6, 2012 · Senate

    Senate amendment 1 to Senate substitute amendment 3 offered by Senators Taylor, Miller, C. Larson, Vinehout, Carpenter and Lassa

  53. Mar 6, 2012 · Senate

    Referred to committee on Senate Organization, Ayes 33, Noes 0

  54. Mar 6, 2012 · Senate

    Available for scheduling

  55. Mar 7, 2012 · Senate

    LRB correction

  56. Mar 13, 2012 · Senate

    Withdrawn from committee on Senate Organization and rereferred to committee on Judiciary, Utilities, Commerce, and Government Operations, pursuant to Senate Rule 46 (2)(c)

  57. Mar 23, 2012 · Senate

    Failed to concur in pursuant to Senate Joint Resolution 1

Terms on this page

Second chamber's vote

A bill has to pass both the Assembly and the Senate in the same form before it goes to the governor.

Official term: Concurrence. More in the glossary

Senate Joint Resolution 1

The session's calendar. Any bill not passed by its last voting day dies.

Official term: Failed to pass pursuant to SJR 1. More in the glossary

Legislative Reference Bureau

The Legislature's nonpartisan office that drafts bills and writes the summary at the top of each one.

Official term: LRB analysis. More in the glossary

Author

A lawmaker who formally puts a bill forward. The text itself is drafted by the Legislative Reference Bureau.

Official term: Author, coauthor. More in the glossary

Signed on in support

Lawmakers who back a bill without being one of its authors, often from the other chamber.

Official term: Cosponsor. More in the glossary

Cost estimate

A state agency's estimate of what a bill would cost or save.

Official term: Fiscal estimate. More in the glossary

Roll call

A vote where each lawmaker's yes or no is recorded by name.

Official term: Roll call vote. More in the glossary

From the Wisconsin Legislature's official record, checked Sep 15, 2026. See the source

Second chamber's vote

A bill has to pass both the Assembly and the Senate in the same form before it goes to the governor.

Official term: Concurrence

Senate Joint Resolution 1

The session's calendar. Any bill not passed by its last voting day dies.

Official term: Failed to pass pursuant to SJR 1

Legislative Reference Bureau

The Legislature's nonpartisan office that drafts bills and writes the summary at the top of each one.

Official term: LRB analysis

Author

A lawmaker who formally puts a bill forward. The text itself is drafted by the Legislative Reference Bureau.

Official term: Author, coauthor

Signed on in support

Lawmakers who back a bill without being one of its authors, often from the other chamber.

Official term: Cosponsor

Cost estimate

A state agency's estimate of what a bill would cost or save.

Official term: Fiscal estimate

Roll call

A vote where each lawmaker's yes or no is recorded by name.

Official term: Roll call vote