Skip to content

Bills · 2011-2012 Regular Session

AB 73

Died at session end Official bill text Atom feed

the deadline for registering certain piers and wharves with the Department of Natural Resources.

  1. Introduced, stopped here
  2. Passes Assembly, not reached
  3. Passes Senate, not reached
  4. Governor signs, not reached
  5. Law, not reached

Unfamiliar terms? Glossary

What this bill does

Plain-language analysis by the nonpartisan Legislative Reference Bureau

Under current law, with certain exceptions, no person may deposit any material

or place any structure upon the bed of any navigable water where no bulkhead line

has been established or, if a bulkhead line has been established, beyond that

established line unless the Department of Natural Resources (DNR) grants that

person a permit. A bulkhead line is a line established by a municipality in the public

interest that conforms as nearly as practicable to an existing shore.

Under current law, a riparian owner is exempt from obtaining a permit in order

to place a pier or wharf on the bed of a navigable water if the riparian owner meets

certain requirements. A pier or wharf qualifies for a permitting exemption if it is

placed in an area other than an area of special natural resource interest, if it does

not interfere with the rights of other riparian owners, if it meets certain size

requirements, and if it has fewer than a specified number of boat slips (general pier

exemption). The general pier exemption prohibits a pier or wharf from being more

than six feet wide but allows the pier or wharf to have an area as a loading platform

that is up to eight feet wide provided that the platform meets certain configuration

requirements.

In addition to the general pier exemption, current law exempts from the permit

requirement certain piers and wharves that were placed in the water on or before

February 6, 2004 (grandfathered piers). Under that exemption, a grandfathered pier

may be up to eight feet wide. A grandfathered pier may also have a loading platform

that meets certain other size and configuration requirements. Current law provides

that in order to obtain an exemption for a grandfathered pier, the riparian owner

must register the grandfathered pier with DNR no later than April 1, 2011. There

is no requirement in current law to register a pier that meets the requirements for

the general pier exemption.

This bill extends the deadline for the registration of grandfathered piers.

Under the bill, the deadline for registration of a grandfathered pier is April 1, 2012.

Sponsors

Introduced by: Mursau (R)

3 cosponsors

Jacque (R) , Kedzie (R) , Zipperer (R)

Votes

Assembly: Report passage recommended by committee on Natural Resources, Ayes 15, Noes 0

Passed 15–0 May 3, 2011 official source full page

No individual roll call was recorded for this vote. Committee votes and some older sessions record totals only.

Full history

  1. Apr 6, 2011 · Assembly

    Introduced by Representative Mursau;Cosponsored by Senator Kedzie

  2. Apr 6, 2011 · Assembly

    Read first time and referred to committee on Natural Resources

  3. Apr 13, 2011 · Assembly

    Public hearing held

  4. Apr 14, 2011 · Assembly

    Senator Zipperer added as a cosponsor

  5. Apr 27, 2011 · Assembly

    Executive action taken

  6. May 2, 2011 · Assembly

    Representative Jacque added as a coauthor

  7. May 3, 2011 · Assembly

    Report passage recommended by committee on Natural Resources, Ayes 15, Noes 0

  8. May 3, 2011 · Assembly

    Referred to committee on Rules

  9. May 5, 2011 · Assembly

    Placed on calendar 5-10-2011 by committee on Rules

  10. May 10, 2011 · Assembly

    Laid on the table

  11. Mar 23, 2012 · Assembly

    Failed to pass pursuant to Senate Joint Resolution 1