Senate Bill 488

Regulation of ferrous metallic mining and related activities, procedures for obtaining approvals from the Department of Natural Resources for the construction of utility facilities, making an appropriation, and providing penalties

Topics: Electric utility, Flood plain zoning, Mine and mining, Natural Resources, Department of: Environmental protection, Public Service Commission, Shoreland zoning, Water: Pollution, Waterways and water power, Wells, Wetland

Stopped before the full Senate voted

The recommended passing it, but the full Senate never voted on it. To try again, a lawmaker would have to start a new bill.

  1. Introduced, passed

    Feb 16, 2012

  2. Committee, passed

    Approved

  3. Senate vote, stopped here

    Stopped here. The full Senate never voted on it.

  4. Assembly vote, not reached

  5. Governor, not reached

  6. Law, not reached

Latest entry in the official record, Mar 23, 2012: “Failed to pass pursuant to ⁠”

Read the bill

Following saves it on this device. New actions show on your Following page. You can also get updates in a feed reader.

What it would have done

Summary by the , the Legislature's nonpartisan drafting office. It's their wording, not ours.

Overview This bill makes changes in the laws relating to the regulation of iron mining and procedures for utility facility approvals.

Procedures for utility facility approvals Under current law, with certain exceptions, a person may not begin the construction of certain utility facilities before the Public Service Commission (PSC) has issued to the person either a certificate of public convenience and necessity (CPCN) or a certificate authorizing the person to transact public utility business (PSC certificate). Current law also provides that a utility facility that is required to obtain a PSC certificate and that is required to obtain one or more permits from the Department of Natural Resources (DNR), such as a permit allowing the placement of a structure in navigable waters, must use a procedure that requires the utility facility to submit only one application to DNR for all of the required DNR permits (combined permit procedure) rather than submitting separate applications to DNR for each permit. Current law also specifies that the applicant under the combined permit procedure must submit the combined application for permits to DNR at the same time that the applicant files an application for a PSC certificate.

Read the full summary

This bill makes the combined permit procedure optional and allows a utility facility to submit separate applications to DNR for each required permit. Under the bill, if the utility facility does not use the combined permit procedure, it is not required to file a DNR permit application at the same time that it files an application for a PSC certificate.

Current law requires a person proposing to construct a large electric generating facility or high-voltage transmission line (facility) to provide DNR with an engineering plan or project plan for the facility at least 60 days before filing an application with PSC for a CPCN. Within 30 days thereafter, DNR must provide the person with a listing of each DNR approval that appears to be required for the construction or operation of the facility. Current law requires the person to file the application for these approvals within 20 days after receiving the listing from DNR.

This bill eliminates this 20-day deadline and also specifies that the person must only apply for those approvals identified in the listing that are applicable.

Iron mining, generally Under current law, DNR regulates mining for metallic minerals. The laws under which DNR regulates metallic mining apply to mining for ferrous minerals (iron) and mining for nonferrous minerals, such as copper or zinc.

This bill creates new statutes for regulating iron mining and modifies the current laws regulating metallic mining so that they cover only mining for nonferrous minerals.

Under current law, a person who proposes to mine for metallic minerals must obtain a mining permit and any other permit, license, certification, or other authorization (approval) that is required under the environmental and natural resources laws, other than the mining laws, for example, wastewater discharge permits, high capacity well approvals, and water quality certifications for wetlands.

Under the bill, a person who proposes to mine for iron ore must obtain an iron mining permit. The person must obtain some of the approvals under other environmental and natural resources laws, for example, wastewater discharge permits, but the bill provides new approvals in lieu of some current approvals, for example, high capacity well approvals and water quality certifications for wetlands.

The standards and procedures for granting, and the requirements related to, an iron mining permit and the other new approvals differ in some respects from the standards, procedures, and requirements under current law, as described below.

Current law requires DNR to promulgate rules specifying standards for metallic mining and for the reclamation of mining sites. The rules relating to mining must contain standards for grading and stabilization, backfilling, vegetative cover, prevention of pollution resulting from leaching of waste materials, and prevention of significant environmental pollution. The rules relating to reclamation must contain provisions for disposal of wastes in disposal facilities licensed under the solid waste laws or otherwise in an environmentally sound manner, for management of runoff so as to prevent soil erosion, flooding, and water pollution, and for minimization of disturbance to wetlands. DNR has promulgated rules on these matters.

The bill places standards for iron mining and for the reclamation of iron mining sites in the statutes, rather than requiring rule-making. The standards in the bill are similar in many respects to DNR's current rules and are less stringent in other respects.

Application for mining permit Under current law, a person who intends to apply for a permit for mining for metallic ore must notify DNR before collecting data intended to be used to support the application. DNR is required to provide public notice when it receives such a notification. After considering public comments, DNR must tell the person who filed the notice of intent what information DNR believes is needed to support an application for a mining permit. The person must submit the information as soon as it is in final form.

This bill requires a person who is contemplating a mining project to provide DNR with a general description of the proposed mining project. The description must include a description of the mining site, including the nature, extent, and final configuration of the proposed excavation and mining site and certain other information including a map showing the boundaries of the area of land that will be affected by the mining project and the names of each owner of the mining site. The bill requires the person to include this information with the bulk sampling plan, described below, or if the person does not file a bulk sampling plan, with the person's notification to DNR of the person's intent to apply for an iron mining permit. The bill requires DNR to conduct a public informational hearing on a proposed mining project after receiving the general description, either as part of the hearing on approvals required for bulk sampling or, if there is no such hearing, as a separate hearing.

This bill requires a person who intends to apply for an iron mining permit to notify DNR of the intention to file the application and requires DNR to meet with the applicant to make a preliminary assessment of the project's scope, to make an analysis of alternatives, to identify potential interested persons, and to ensure that the person intending to apply for an iron mining permit is aware of the approvals that the person may be required to obtain. DNR must also ensure that the person is aware of the requirements for submission of an environmental impact report and about the information DNR will require to enable it to process the application for the mining permit in a timely manner.

After the meeting, DNR must provide to the applicant any available information relevant to the potential impact of the project on threatened or endangered species and historic or cultural resources and any other information relevant to impacts that are required to be considered in the environmental impact statement.

Under current law, a person who wishes to obtain a permit for metallic mining must submit an application to DNR that includes a mining plan, a reclamation plan, information about the owners of the mining site, and information related to the failure to reclaim mining sites and to any criminal convictions for violations of environmental laws in the course of mining by persons involved in the proposed mining. The application must also include evidence that the applicant has applied for necessary approvals under applicable zoning ordinances and for any approvals issued by DNR that are necessary to conduct the mining, such as air pollution permits and wastewater discharge permits.

This bill includes similar provisions for the application for an iron mining permit, except that the applicant may provide evidence that the applicant will apply, rather than has applied, for necessary zoning approvals and other approvals issued by DNR.

The required content of the mining plan for iron mining under the bill is similar to that required under current statutes and DNR rules. The required content of the reclamation plan for iron mining is also similar to that required under current law.

DNR's current rules require the applicant for a metallic mining permit to show that the mining and reclamation will comply with specified minimum standards.

The bill requires showings by the applicant for an iron mining permit that differ in some ways from DNR's rules. For example, the rules require a demonstration that water runoff from the mining site will be managed so as to prevent soil erosion to the extent practicable, flooding, damage to agricultural lands or livestock, damage to wild animals, pollution of ground or surface waters, damage to public health, and threats to public safety. The bill requires a showing that water runoff from an iron mining site will be managed in compliance with any approval that regulates construction site erosion control or storm water management.

Permitting process Environmental impact statement Current law requires DNR to prepare an environmental impact statement (EIS) for every proposed metallic mine. An EIS contains detailed information about the environmental impact of a proposed project, including any adverse environmental effects that cannot be avoided if the proposal is implemented, alternatives to the proposed project, the beneficial aspects of the proposal, and the economic advantages and disadvantages of the proposal. For a metallic mining project, current law requires a description of significant long-term and short-term impacts, including impacts after the mining has ended, on tourism, employment, schools, social services, the tax base, the local economy, and "other significant factors."

This bill requires DNR to prepare an EIS for every proposed iron mine. The bill requires DNR to include a description of significant impacts on most of the same matters as under current metallic mining law.

Under current law, when a person applies for a permit or other approval for which DNR is required to complete an EIS, DNR is generally authorized to require the applicant to prepare an environmental impact report (EIR) that discloses environmental impacts of the proposed project to assist DNR in preparing the EIS.

Current law authorizes DNR to enter into an agreement with a person considering applying to DNR for approval of a project that is large, complex, or environmentally sensitive to provide preapplication services necessary to evaluate the environmental impact of the project and to expedite the anticipated preparation of an EIS for the project.

The bill requires the applicant for a mining permit to prepare an EIR.

The bill requires the applicant for a mining permit to submit the EIR with the application for the mining permit.

Current law authorizes DNR to conduct the processes related to an EIS jointly with other agencies who have responsibilities related to a proposed project.

The bill requires DNR to conduct its environmental review process for a proposed iron mine jointly with other state agencies and requires the preparation of one joint EIS. The bill requires DNR to conduct its environmental review process jointly with any federal or local agency that consents to a joint process.

Current law requires DNR to hold at least one informational meeting on a preliminary environmental report for a mining project before it issues the EIS. This bill does not require such an informational meeting.

Mining hearing Current law requires DNR to hold a hearing on an application for a metallic mining permit. The hearing includes both a contested case hearing, with testimony under oath and the opportunity for cross-examination, and a public informational hearing. The law requires that the hearing cover the EIS and cover all other approvals issued by DNR that are required for the mining project, to the extent possible. Under current law, the provisions related to notice, hearing, and comment in the metallic mining law apply to any other needed approval, unless the applicant fails to make an application for an approval in time for it to be considered at the hearing on the mining permit.

This bill requires DNR to hold a public informational hearing for a proposed iron mining project. The hearing does not include a contested case hearing. The hearing must cover the mining permit, the EIS, and all other approvals issued by DNR that are required for the mining project, unless the application for an approval is filed too late to allow the approval to be considered at the mining hearing. Under the bill, the provisions related to notice, hearing, and comment in the iron mining law apply to any other needed approval.

Deadlines; automatic approval Current law does not specify a time, after the application for a mining permit is filed, within which DNR must act on a metallic mining permit application. It does require the mining hearing to be held between 120 days and 180 days after DNR issues the EIS and requires DNR to act on the permit within 90 days after the completion of the record for the public hearing.

The bill requires DNR to act on an application for an iron mining permit no more than 360 days after the application is considered to be complete. Under the bill, if the applicant submits the application for another approval within 60 days after the application for the mining permit is considered to be complete, DNR must also act on the application for that approval by the 360-day deadline. If the applicant files the application for another approval more than 60 days after the application for the mining permit is considered to be complete, the deadline for DNR's action on the approval is extended by the number of days the application is late.

If DNR does not act within the deadline for acting on the application for an iron mining permit, the application is automatically approved.

Under the bill, the application for a mining permit is considered to be complete on the 30th day after DNR receives it, unless, before that day DNR provides the applicant with written notification that the application does not include a mining plan, reclamation plan, or waste site feasibility study and plan of operation that contain the types of information required under the bill or that the applicant has not submitted an EIR. DNR may not consider the quality of the information provided in determining whether the application is complete.

The bill authorizes DNR to request additional information needed to process the application for a mining permit after the application is considered to be complete, but it may not delay the determination that the application is complete based on a request for additional information.

Grant or denial of mining permit Down Down /2011/related/proposals/sb488 true proposaltext /2011/related/proposals/sb488 proposaltext/2011/REG/SB488 proposaltext/2011/REG/SB488 section true Menu » 2011 » Related Documents » Proposal Text » SB488: Bill Text × Details for PDF view Link (Permanent link) Bookmark this location View toggle Go to top of document Search in this chapter Search in this section Search in this agency Search in this chapter group Search in this chapter Search in this section Cross references for section Acts affecting this section References to this 1970 Statutes Annotations Appellate Court Citations Administrative Code Index Reference lines Clear highlighting $(document).ready(function () {

$('[data-toggle=tooltip]').tooltip({ container: 'body' });

});

Who's behind it

11 senators are its ⁠. All 11 are Republicans.

59 more lawmakers ⁠.

See all 70 names

Authors (11)

Signed on in support (59)

What it would cost

State agencies filed a . Each opens as a PDF from the Legislature.

Versions and amendments

Every text the Legislature printed for this bill, including proposed changes. Each opens on the Legislature's site.

How lawmakers voted

There was one vote on this bill.

Joint Committee on Finance vote on an amendment

Passed, 16 to 0 · Mar 6, 2012

No member-by-member record exists for this vote. Committee votes and some older sessions record totals only.

Official motion: “Report introduction of Senate Substitute Amendment 1 recommended by joint committee on Finance, Ayes 16, Noes 0 by joint committee on Finance”. Official record · This vote on its own page

What happened

  1. Mar 23, 2012

    The session ended, and the bill died with it.

  2. Mar 13, 2012

    Sent to the Senate Committee on Judiciary, Utilities, Commerce, and Government Operations,.

  3. Mar 6, 2012

    The committee voted to recommend passing it, 12 to 4.

  4. Mar 6, 2012

    “Report introduction of Senate Substitute Amendment 2 recommended by joint committee on Finance, Ayes 16, Noes 0” (the official wording)

  5. Mar 6, 2012

    “Report introduction of Senate Substitute Amendment 1 recommended by joint committee on Finance, Ayes 16, Noes 0 by joint committee on Finance” (the official wording)

  6. Feb 24, 2012

    A state agency sent in its estimate of the cost.

  7. Feb 17, 2012

    The committee held a public hearing.

  8. Feb 16, 2012

    Sent to the Joint Committee on Finance.

  9. Feb 16, 2012

    Introduced in the Senate.

See the official record, word for word
  1. Feb 16, 2012 · Senate

    Introduced by Senators Galloway, Vukmir, Zipperer, Wanggaard, Darling, S. Fitzgerald, Lasee, Lazich, Leibham, Kedzie and Grothman;Cosponsored by Representatives J. Fitzgerald, Suder, Williams, Tiffany, Honadel, August, Ballweg, Bernier, Bies, Brooks, Craig, Endsley, Farrow, Jacque, Kapenga, Kaufert, Kerkman, Kestell, Kleefisch, Klenke, Knilans, Knodl, Knudson, Kooyenga, Kramer, Krug, Kuglitsch, T. Larson, LeMahieu, Litjens, Loudenbeck, Marklein, Meyer, Mursau, Murtha, Nass, Nerison, Nygren, A. Ott, J. Ott, Petersen, Petrowski, Petryk, Pridemore, Ripp, Rivard, Severson, Spanbauer, Steineke, Stone, Strachota, Stroebel, Tauchen, Thiesfeldt, Tranel, Van Roy, Vos, Weininger and Wynn

  2. Feb 16, 2012 · Senate

    Read first time and referred to joint committee on Finance

  3. Feb 17, 2012 · Senate

    Public hearing held

  4. Feb 24, 2012 · Senate

    Fiscal estimate received

  5. Feb 24, 2012 · Senate

    Fiscal estimate received

  6. Mar 1, 2012 · Senate

    LRB correction

  7. Mar 5, 2012 · Senate

    Executive action taken

  8. Mar 6, 2012 · Senate

    LRB correction

  9. Mar 6, 2012 · Senate

    Report introduction of Senate Substitute Amendment 1 recommended by joint committee on Finance, Ayes 16, Noes 0 by joint committee on Finance

  10. Mar 6, 2012 · Senate

    Report introduction of Senate Substitute Amendment 2 recommended by joint committee on Finance, Ayes 16, Noes 0

  11. Mar 6, 2012 · Senate

    Report passage as amended recommended by joint committee on Finance, Ayes 12, Noes 4

  12. Mar 6, 2012 · Senate

    Available for scheduling

  13. Mar 6, 2012 · Senate

    Senate substitute amendment 3 offered by Senators Jauch, Schultz, King, Holperin, Hansen, Erpenbach, T. Cullen, C. Larson, Wirch, S. Coggs, Taylor and Vinehout

  14. Mar 13, 2012 · Senate

    Withdrawn from committee on Senate Organization and rereferred to committee on Judiciary, Utilities, Commerce, and Government Operations, pursuant to Senate Rule 46 (2)(c)

  15. Mar 23, 2012 · Senate

    Failed to pass pursuant to Senate Joint Resolution 1

Terms on this page

Committee

A small group of lawmakers that looks at a bill first. Most bills never leave committee.

More in the glossary

Senate Joint Resolution 1

The session's calendar. Any bill not passed by its last voting day dies.

Official term: Failed to pass pursuant to SJR 1. More in the glossary

Legislative Reference Bureau

The Legislature's nonpartisan office that drafts bills and writes the summary at the top of each one.

Official term: LRB analysis. More in the glossary

Author

A lawmaker who formally puts a bill forward. The text itself is drafted by the Legislative Reference Bureau.

Official term: Author, coauthor. More in the glossary

Signed on in support

Lawmakers who back a bill without being one of its authors, often from the other chamber.

Official term: Cosponsor. More in the glossary

Cost estimate

A state agency's estimate of what a bill would cost or save.

Official term: Fiscal estimate. More in the glossary

Roll call

A vote where each lawmaker's yes or no is recorded by name.

Official term: Roll call vote. More in the glossary

From the Wisconsin Legislature's official record, checked Sep 15, 2026. See the source

Committee

A small group of lawmakers that looks at a bill first. Most bills never leave committee.

Senate Joint Resolution 1

The session's calendar. Any bill not passed by its last voting day dies.

Official term: Failed to pass pursuant to SJR 1

Legislative Reference Bureau

The Legislature's nonpartisan office that drafts bills and writes the summary at the top of each one.

Official term: LRB analysis

Author

A lawmaker who formally puts a bill forward. The text itself is drafted by the Legislative Reference Bureau.

Official term: Author, coauthor

Signed on in support

Lawmakers who back a bill without being one of its authors, often from the other chamber.

Official term: Cosponsor

Cost estimate

A state agency's estimate of what a bill would cost or save.

Official term: Fiscal estimate

Roll call

A vote where each lawmaker's yes or no is recorded by name.

Official term: Roll call vote