Assembly Bill 506
Professional land surveyors; the practice of professional land surveying; surveying land abutting navigable waters; various changes regarding platting, surveying, and certified survey maps; and granting rule-making authority. (FE)
Became law
The governor signed it on Apr 23, 2014. It's .
-
Introduced, passed
Nov 12, 2013
-
Committee, passed
Approved
-
Assembly vote, passed
Passed Feb 13, 2014
-
Senate vote, passed
Passed Mar 18, 2014
-
Governor, passed
Signed
-
Law, here now
2013 Wisconsin Act 358
Latest entry in the official record, Apr 23, 2014: “Published 4-24-2014”
Following saves it on this device. New actions show on your Following page. You can also get updates in a feed reader.
Terms on this page
Wisconsin Act
The number a bill gets when it becomes law, like 2025 Wisconsin Act 12.
Official term: Act. More in the glossary
Legislative Reference Bureau
The Legislature's nonpartisan office that drafts bills and writes the summary at the top of each one.
Official term: LRB analysis. More in the glossary
Author
A lawmaker who formally puts a bill forward. The text itself is drafted by the Legislative Reference Bureau.
Official term: Author, coauthor. More in the glossary
Signed on in support
Lawmakers who back a bill without being one of its authors, often from the other chamber.
Official term: Cosponsor. More in the glossary
Cost estimate
A state agency's estimate of what a bill would cost or save.
Official term: Fiscal estimate. More in the glossary
Roll call
A vote where each lawmaker's yes or no is recorded by name.
Official term: Roll call vote. More in the glossary
What it does
Summary by the , the Legislature's nonpartisan drafting office. It's their wording, not ours.
Under current law, with certain exceptions, a person may not practice land surveying or represent that he or she is a land surveyor unless the Land Surveyor Section (section) of the Examining Board of Architects, Landscape Architects, Professional Engineers, Designers and Land Surveyors (board) has issued a certificate of registration or a permit to the person. "Land surveying" is defined as determining the location of land boundaries and boundary corners; preparing maps that show the shape and area of tracts of land or subdivisions or the layout of roads, streets, or rights-of-way; or preparing official plats or maps of land in this state.
This bill replaces "land surveying" with the term "practice of professional land surveying" and defines the term as any of the following:
Read the full summary Show less
1. Any service comprising the establishment or reestablishment of the boundaries of one or more tracts of land or the boundaries of any of the following interests in real property: a) the alignment and rights-of-way of roads or streets;
b) air or subsurface property rights; or c) public or private easements.
2. Designing or coordinating designs for the purpose of platting or subdividing land into smaller tracts.
3. Placing, replacing, restoring, or perpetuating monuments in or on the ground to evidence the location of a point that is necessary to establish boundaries of one or more tracts of land or the subdivision or consolidation of one or more tracts of land or that is necessary to describe the boundaries of any interest in real property identified in item 1.
4. Preparing maps that depict any interest in real property identified in item 1. for the purpose of establishing the boundaries of any such interest in real property.
5. Preparing any of the following: a) an official map established or amended by a city, established or amended by a village, or adopted by a town; b) an assessor's plat;
c) a map or plat of cemetery lands; d) a subdivision plat, certified survey map, or correction instrument; e) a condominium plat or correction instrument; or f) a project and time-share plat.
6. Performing construction or geodetic surveying in connection with any of the practices specified in items 1. to 5.
The bill also replaces the certificate of registration requirement under current law with a license requirement. Under the bill, with certain exceptions, a person may not engage in the practice of professional land surveying or represent that he or she is a professional land surveyor unless the person is issued a license or permit by the section.
In addition, the bill changes the name of the section to the Professional Land Surveyor Section and changes the name of the board to the Examining Board of Architects, Landscape Architects, Professional Engineers, Designers, and Professional Land Surveyors. The bill also replaces various references under current law to "registered land surveyor," "land surveyor," and "surveyor" with "professional land surveyor."
Under current law, a person who has completed an apprenticeship training course in land surveying, engaged in land surveying for eight years, and passed oral and written examinations may be registered as a land surveyor. This bill eliminates that pathway to licensure.
Current law authorizes the section to grant a permit to practice land surveying to a person while the application for a certificate of registration is pending if the person has paid a fee and holds an unexpired certification that satisfies one of the requirements for registration in this state. Such a permit may be revoked by the section at any time. The bill eliminates that authorization to grant a permit.
Current law offers several exemptions from registration as a land surveyor.
Current law exempts officers and employees of the federal government and employees of this state from any licensure requirement while the individuals are engaged in land surveying for the federal or state government, respectively. This bill eliminates those exemptions. Current law also exempts employees of public utilities who are engaged in land surveying. This bill retains that exemption until June 30, 2019.
Current law permits a town board to contract with the county surveyor or any registered land surveyor to survey all or some of the sections of the town and to erect monuments. The surveyor retained by the town must prepare a certificate that provides a record of any survey created and that documents actions taken by the county surveyor. The certificate must include the bearings of and distance between monuments and must be recorded in the office of the county register of deeds. This bill requires, instead, that a surveyor retained by the town prepare a U.S. Public Land Survey monument record (monument record) that documents the actions taken by the surveyor, including every monument erected on section and quarter section corners. The monument record must be either recorded with the register of deeds or filed in the office of the county surveyor in the county in which the land is located. Current law permits the town board to determine the nature of the monument, but the monument must be either a stone or other durable material of certain dimensions or a three-inch diameter iron pipe of certain dimensions. This bill permits the town board and the surveyor to agree upon an equivalent monument.
Under current law, a cemetery authority must have lands that will be used for burial surveyed and platted into cemetery lots, drives, and walks. The plat or map must show the location of the land being subdivided with reference to a corner or corners established by the U.S. Public Land Survey by bearings and distances. This bill requires, instead, that the location of the lands be indicated on the plat or map by bearing and distance from the boundary line of a government lot, quarter section, recorded private claim, or federal reservation in which the subdivision is located and the monumentation at the ends of the boundary line must be described and the bearing and distance shown.
Under current law, a registered land surveyor who prepares a lake or stream shore plat must show certain dimensions as measured from the ordinary high water mark (OHWM) of the lake or stream. The bill authorizes a professional land surveyor to incorporate an OHWM that has been determined by the Department of Natural Resources (DNR) or that has otherwise been determined by law or to approximate the OHWM. The bill requires that statements be included on the face of certain plats or maps that explain that the land below the OHWM of a navigable water is subject to the public trust doctrine for navigable waters and that exposed land between the OHWM and the water's edge is to be used exclusively by the owner of the adjacent waterfront property, unless otherwise provided by law or by the owner's title.
The bill makes a number of changes to the laws relating to subdivision plats, certified survey maps, and the recording of certain plats, including the following:
1. Under current law, a subdivision plat may not be recorded unless it is approved by, depending on the location of the subdivision that is the subject of the plat, the governing body of a town, city, or village and, in some circumstances, a county planning agency (approving authorities). The plat must also be reviewed (to determine whether there is an objection) by a county planning agency, county park commission, or county park manager for any conflict with parks, parkways, or other planned public developments; the Department of Administration (DOA); if the subdivision abuts or adjoins a state highway, the Department of Transportation (DOT); and, if the subdivision is not served by a public sewer and provision for that service has not been made, the Department of Safety and Professional Services (DSPS) (objecting agencies). Current law specifies the number of copies of the plat that must be submitted, to whom they must be submitted, and the time limits within which the approving authorities and objecting agencies must act and provides two different procedures that may be used by a subdivider. The bill simplifies the approval process by limiting it to a single procedure, which is, for the most part, one of the two procedures under current law.
Under the bill, the subdivider or subdivider's agent must submit an electronic copy of the preliminary or final plat, or a copy that is capable of legible reproduction, to the approving authority or authorities and to DOA. DOA must examine the plat for compliance with certain statutory requirements and, within two days, transmit an electronic copy or two legible hard copies of the plat to DOT or DSPS or both, based on the criteria under current law. Also within two days after receiving the copy of the plat, DOA must transmit copies of the plat to the county planning agency, county park commission, or county park manager for making the determinations required under current law. Each objecting agency has 20 days after receiving a copy of the plat to notify the subdivider and all other objecting agencies of any objection to the plat, or to certify on the face of a copy of the plat that it has no objection and to return that copy to DOA. DOA then must certify on the face of the plat that each objecting agency has certified that it has no objection or that its objection has been satisfied.
If an objecting agency other than DOA fails to act within 20 days after receiving a copy of the plat, or if DOA fails to act within 30 days after receiving a copy of the plat, it is deemed that there are no objections to the plat and, upon demand, DOA must so certify on the face of the plat.
As under current law, the approving authority or authorities have 60 days after receiving the plat to approve or reject it, but no approving authority may inscribe its final approval on the plat before DOA has certified that there are no objections to the plat.
2. Current law provides that public access to a navigable lake or stream that is established when a subdivision is platted may be vacated only by court action. The bill specifies that such public access may, in addition, be discontinued through a process that exists under current law in which a city, village, town, or county may, by resolution, discontinue a public way upon the written petition of the requisite number of landowners abutting the public way. Current law also provides that DNR must approve of any such discontinuation by a town or county if the public way provides public access to a navigable lake or stream.
3. Current law specifies where monuments must be placed when a subdivision is surveyed and provides that, if a monument would have to be placed in a street when the external boundaries of a subdivision are surveyed, the monument may be placed in the side line of the street. The bill expands this provision to surveys of all parts of a subdivision, not just the external boundaries.
4. Current law provides that a subdivider's project may be constructed in phases and that the amount of any security required by the municipality in which the project is located must be limited to the phase of the project currently being constructed. The bill makes this provision retroactive to all subdivision plats, regardless of when submitted for approval.
5. Under current law, a subdivision plat must have a binding margin that is one and one-half inches on the left side and a one-inch margin on all other sides; all lands dedicated to public use, except roads and streets, must be clearly marked on the plat as dedicated to the public; and the location of the subdivision must be indicated by bearing and distance from a boundary line of a quarter section, recorded private claim, or federal reservation. The bill changes the plat margin requirements to one inch on all sides, requires roads and streets that are dedicated to public use also to be marked as dedicated to the public, and adds that the location of the subdivision may be indicated by bearing and distance from a boundary line of a government lot monumented in the original survey or resurvey of Wisconsin.
6. The bill clarifies that if land shown in a subdivision plat or certified survey map that is to be recorded is shown in a previously recorded plat or certified survey map, it may be described in the new plat or certified survey map by the subdivision name or previous certified survey map number rather than requiring a metes-and-bounds description of the land.
7. Under current law, a certified survey map may not be recorded unless it is offered for record within 6 months after the last approval and within 24 months after the first approval. The bill increases this timeline to within 12 months after the last approval and within 36 months after the first approval.
8. The bill explicitly allows certified survey maps to be used to grant easements to the public or any person, society, or corporation.
9. Current law provides a procedure for vacation of a subdivision plat by a circuit court. The bill establishes a similar procedure for vacation of a certified survey map by a circuit court.
10. The bill provides that the following documents may be produced for recording on any media that is acceptable to the register of deeds: a subdivision plat, a certified survey map, an assessor's plat, a cemetery plat, a condominium plat, and a time-share plat.
11. Current law provides a penalty of not more than $250 or imprisonment for not more than one year in the county jail for various violations related to the placement of monuments by a surveyor. The bill provides that each monument to which a violation applies is a separate violation and therefore subject to a separate penalty.
The bill codifies the holding of the Wisconsin Supreme Court in FAS, LLC v.
Town of Bass Lake , 2007 WI 73, 301 Wis. 2d 321, 733 N.W.2d 287, by specifying that, unless a local ordinance provides otherwise, a navigable stream running through a parcel of property does not, in and of itself, divide the parcel into two lots if the same person holds title to the property on both sides of the stream.
Who's behind it
3 lawmakers are its . All 3 are Republicans.
2 more lawmakers .
See all 5 names Hide the names
Authors (3)
- Alvin Ott · Republican, Assembly
- Howard Marklein · Republican, Senate
- Thomas Weatherston · Republican, Assembly
Signed on in support (2)
- Frank G. Lasee · Republican, Senate
- Timothy Cullen · Democrat, Senate
What it would cost
State agencies filed a . Each opens as a PDF from the Legislature.
Versions and amendments
Every text the Legislature printed for this bill, including proposed changes. Each opens on the Legislature's site.
How lawmakers voted
There were 6 votes on this bill.
Assembly Committee on State Affairs and Government Operations vote on an amendment
Passed, 16 to 0 · Feb 7, 2014
No member-by-member record exists for this vote. Committee votes and some older sessions record totals only.
Official motion: “Report Assembly Amendment 2 adoption recommended by Committee on State Affairs and Government Operations, Ayes 16, Noes 0”. Official record · This vote on its own page
Assembly Committee on State Affairs and Government Operations vote on an amendment
Passed, 16 to 0 · Feb 7, 2014
No member-by-member record exists for this vote. Committee votes and some older sessions record totals only.
Official motion: “Report Assembly Amendment 3 adoption recommended by Committee on State Affairs and Government Operations, Ayes 16, Noes 0”. Official record · This vote on its own page
Assembly Committee on State Affairs and Government Operations vote on an amendment
Passed, 16 to 0 · Feb 7, 2014
No member-by-member record exists for this vote. Committee votes and some older sessions record totals only.
Official motion: “Report Assembly Amendment 4 adoption recommended by Committee on State Affairs and Government Operations, Ayes 16, Noes 0”. Official record · This vote on its own page
Assembly Committee on State Affairs and Government Operations vote on an amendment
Passed, 16 to 0 · Feb 7, 2014
No member-by-member record exists for this vote. Committee votes and some older sessions record totals only.
Official motion: “Report Assembly Amendment 5 adoption recommended by Committee on State Affairs and Government Operations, Ayes 16, Noes 0”. Official record · This vote on its own page
Assembly Committee on State Affairs and Government Operations vote to recommend it
Passed, 16 to 0 · Feb 7, 2014
No member-by-member record exists for this vote. Committee votes and some older sessions record totals only.
Official motion: “Report passage as amended recommended by Committee on State Affairs and Government Operations, Ayes 16, Noes 0”. Official record · This vote on its own page
Senate vote
Passed, 5 to 0 · Mar 14, 2014
No member-by-member record exists for this vote. Committee votes and some older sessions record totals only.
Official motion: “Public hearing requirement waived by committee on Senate Organization, pursuant to Senate Rule 18 (1m), Ayes 5, Noes 0”. Official record · This vote on its own page
What happened
-
Apr 23, 2014
The new law was published.
-
Apr 23, 2014
The governor signed it. It became 2013 Wisconsin Act 358.
-
Apr 22, 2014
Sent to the governor.
-
Mar 18, 2014
The Senate passed it too.
-
Mar 14, 2014
“Public hearing requirement waived by committee on Senate Organization, pursuant to Senate Rule 18 (1m), Ayes 5, Noes 0” (the official wording)
-
Mar 4, 2014
A state agency sent in its estimate of the cost.
-
Feb 17, 2014
Sent to the Senate Committee on Senate Organization.
-
Feb 14, 2014
The Senate received it.
-
Feb 13, 2014
The Assembly passed it.
-
Feb 13, 2014
The Assembly adopted it.
-
Feb 7, 2014
Sent to the Assembly Committee on Rules.
-
Feb 7, 2014
The committee voted to recommend passing it, 16 to 0.
-
Dec 12, 2013
The committee held a public hearing.
-
Dec 12, 2013
A state agency sent in its estimate of the cost.
-
Dec 6, 2013
A state agency sent in its estimate of the cost.
-
Dec 2, 2013
A state agency sent in its estimate of the cost.
-
Nov 27, 2013
A state agency sent in its estimate of the cost.
-
Nov 26, 2013
A state agency sent in its estimate of the cost.
-
Nov 12, 2013
Sent to the Assembly Committee on State Affairs and Government Operations.
-
Nov 12, 2013
Introduced in the Assembly.
See the official record, word for word Hide the official record
- Nov 12, 2013 · Assembly
Introduced by Representatives Weatherston, Brooks, Czaja, Kooyenga, Marklein and A. Ott; cosponsored by Senators Lasee and T. Cullen
- Nov 12, 2013 · Assembly
Read first time and referred to Committee on State Affairs and Government Operations
- Nov 14, 2013 · Assembly
Representative Czaja withdrawn as a coauthor
- Nov 15, 2013 · Assembly
Representative Brooks withdrawn as a coauthor
- Nov 26, 2013 · Assembly
Fiscal estimate received
- Nov 27, 2013 · Assembly
Fiscal estimate received
- Dec 2, 2013 · Assembly
Fiscal estimate received
- Dec 6, 2013 · Assembly
Fiscal estimate received
- Dec 10, 2013 · Assembly
Assembly Amendment 1 offered by Representative Weatherston
- Dec 10, 2013 · Assembly
Assembly Amendment 2 offered by Representative Weatherston
- Dec 12, 2013 · Assembly
Fiscal estimate received
- Dec 12, 2013 · Assembly
Public hearing held
- Dec 12, 2013 · Assembly
Representative Kooyenga withdrawn as a coauthor
- Jan 15, 2014 · Assembly
Assembly Amendment 3 offered by Representative Weatherston
- Jan 17, 2014 · Assembly
Assembly Amendment 4 offered by Representative Weatherston
- Jan 17, 2014 · Assembly
Assembly Amendment 5 offered by Representative Weatherston
- Jan 22, 2014 · Assembly
Executive action taken
- Feb 7, 2014 · Assembly
Report Assembly Amendment 2 adoption recommended by Committee on State Affairs and Government Operations, Ayes 16, Noes 0
- Feb 7, 2014 · Assembly
Report Assembly Amendment 3 adoption recommended by Committee on State Affairs and Government Operations, Ayes 16, Noes 0
- Feb 7, 2014 · Assembly
Report Assembly Amendment 4 adoption recommended by Committee on State Affairs and Government Operations, Ayes 16, Noes 0
- Feb 7, 2014 · Assembly
Report Assembly Amendment 5 adoption recommended by Committee on State Affairs and Government Operations, Ayes 16, Noes 0
- Feb 7, 2014 · Assembly
Report passage as amended recommended by Committee on State Affairs and Government Operations, Ayes 16, Noes 0
- Feb 7, 2014 · Assembly
Referred to Committee on Rules
- Feb 10, 2014 · Assembly
Assembly Amendment 1 to Assembly Amendment 5 offered by Representative Weatherston
- Feb 11, 2014 · Assembly
Placed on calendar 2-13-2014 by Committee on Rules
- Feb 13, 2014 · Assembly
Read a second time
- Feb 13, 2014 · Assembly
Assembly Amendment 2 adopted
- Feb 13, 2014 · Assembly
Assembly Amendment 3 adopted
- Feb 13, 2014 · Assembly
Assembly Amendment 4 adopted
- Feb 13, 2014 · Assembly
Assembly Amendment 1 to Assembly Amendment 5 adopted
- Feb 13, 2014 · Assembly
Assembly Amendment 5 adopted
- Feb 13, 2014 · Assembly
Ordered to a third reading
- Feb 13, 2014 · Assembly
Rules suspended
- Feb 13, 2014 · Assembly
Read a third time and passed
- Feb 13, 2014 · Assembly
Ordered immediately messaged
- Feb 14, 2014 · Senate
Received from Assembly
- Feb 17, 2014 · Senate
Read first time and referred to committee on Senate Organization
- Feb 17, 2014 · Senate
Available for scheduling
- Mar 4, 2014 · Senate
Fiscal estimate received
- Mar 14, 2014 · Senate
Public hearing requirement waived by committee on Senate Organization, pursuant to Senate Rule 18 (1m), Ayes 5, Noes 0
- Mar 14, 2014 · Senate
Placed on calendar 3-18-2014 pursuant to Senate Rule 18(1)
- Mar 18, 2014 · Senate
Read a second time
- Mar 18, 2014 · Senate
Ordered to a third reading
- Mar 18, 2014 · Senate
Rules suspended
- Mar 18, 2014 · Senate
Read a third time and concurred in
- Mar 18, 2014 · Senate
Ordered immediately messaged
- Mar 18, 2014 · Assembly
Received from Senate concurred in
- Mar 26, 2014 · Assembly
LRB correction (Assembly Amendment 3)
- Mar 26, 2014 · Assembly
LRB correction
- Mar 26, 2014 · Assembly
Report correctly enrolled on 3-26-2014
- Apr 22, 2014 · Assembly
Presented to the Governor on 4-22-2014
- Apr 23, 2014 · Assembly
Report approved by the Governor on 4-23-2014. 2013 Wisconsin Act 358
- Apr 23, 2014 · Assembly
Published 4-24-2014
Terms on this page
Wisconsin Act
The number a bill gets when it becomes law, like 2025 Wisconsin Act 12.
Official term: Act. More in the glossary
Legislative Reference Bureau
The Legislature's nonpartisan office that drafts bills and writes the summary at the top of each one.
Official term: LRB analysis. More in the glossary
Author
A lawmaker who formally puts a bill forward. The text itself is drafted by the Legislative Reference Bureau.
Official term: Author, coauthor. More in the glossary
Signed on in support
Lawmakers who back a bill without being one of its authors, often from the other chamber.
Official term: Cosponsor. More in the glossary
Cost estimate
A state agency's estimate of what a bill would cost or save.
Official term: Fiscal estimate. More in the glossary
Roll call
A vote where each lawmaker's yes or no is recorded by name.
Official term: Roll call vote. More in the glossary
From the Wisconsin Legislature's official record, checked Sep 15, 2026. See the source
Wisconsin Act
The number a bill gets when it becomes law, like 2025 Wisconsin Act 12.
Official term: Act
Legislative Reference Bureau
The Legislature's nonpartisan office that drafts bills and writes the summary at the top of each one.
Official term: LRB analysis
Signed on in support
Lawmakers who back a bill without being one of its authors, often from the other chamber.
Official term: Cosponsor
Cost estimate
A state agency's estimate of what a bill would cost or save.
Official term: Fiscal estimate
Roll call
A vote where each lawmaker's yes or no is recorded by name.
Official term: Roll call vote