Bills · 2013-2014 Regular Session
Relating to: energy supply and demand study and electric utility integrated resource plans. (FE)
Electric utility Electricity Energy conservation Public service commission
- Introduced, stopped here
- Passes Assembly, not reached
- Passes Senate, not reached
- Governor signs, not reached
- Law, not reached
Unfamiliar terms? Glossary
What this bill does
Plain-language analysis by the nonpartisan Legislative Reference Bureau
This bill requires each investor-owned electric public utility (electric utility) to
prepare and submit an integrated resource plan to the Public Service Commission
(PSC). The bill defines "integrated resource plan" as a 20-year plan of an electric
utility for doing all of the following: 1) meeting forecasted demand for electric energy
through a combination of supply-side and demand-side resources; 2) evaluating
certain costs in meeting the forecasted demand; 3) identifying the mix of resources
that would minimize future energy system costs and ensure safe and reliable electric
service; and 4) decreasing the use of imported fossil fuel, increasing energy efficiency,
and reducing electric bills. Regarding the second item, the costs that must be
evaluated are those associated with the options specified in the state energy
priorities law, which prioritizes options for meeting energy demands.
The bill requires an electric utility to submit an integrated resource plan to the
PSC no later than July 1, 2016. If the PSC determines that an electric utility's plan
satisfies the above definition, the PSC must approve the plan. However, if the PSC
determines that the plan does not satisfy the definition, the PSC must order the
electric utility to make revisions and resubmit the plan for the PSC's approval. Also,
before approving a plan, the bill requires the PSC to provide an opportunity for the
public to comment on the plan. In addition, the PSC must make approved plans
available to the public through the PSC's Internet site.
The bill also requires the PSC to submit an energy study report to the
legislature no later than July 1, 2017. The report must do all of the following: 1)
assess current and future energy supply and demand; 2) evaluate the integrated
resource plans submitted under the bill; 3) demonstrate how the PSC considered the
integrated resource plans in assessing energy supply and demand; 4) evaluate the
costs of meeting future energy demand that are associated with the options specified
in the state's energy priorities law; 5) examine policies under state law, rules, and
orders affecting energy supply and demand; 6) make a comparative analysis of those
policies with policies in other states; and 7) identify challenges and opportunities for
ensuring that energy supply adequately meets energy demand. In preparing the
report, the bill requires the PSC to consult with the Department of Administration
and the Department of Natural Resources.