Skip to content

Bills · 2015-2016 Regular Session

AB 825

Died at session end Official bill text Atom feed

Relating to: a study to implement methods to reduce the amount of nutrients introduced into the Wisconsin River and making an appropriation. (FE)

Natural resources, department of — Environmental protection Public employee Public employee — Group insurance Waterways and water power

  1. Introduced, stopped here
  2. Passes Assembly, not reached
  3. Passes Senate, not reached
  4. Governor signs, not reached
  5. Law, not reached

Unfamiliar terms? Glossary

What this bill does

Plain-language analysis by the nonpartisan Legislative Reference Bureau

This bill authorizes the Department of Natural Resources (DNR) to implement

methods to reduce the amounts of nutrients introduced into the Wisconsin River

from the headwaters of the river to the Castle Rock Flowage dam. The bill requires

DNR to implement these methods based upon the results of a study that DNR is

required to conduct under current law.

The bill also appropriates amounts from the general fund for project positions

to implement the study.

What it would cost

Fiscal estimates filed by state agencies, as official PDFs

Sponsors

Introduced by: A. Ott (R) , Krug (R)

1 cosponsors

Lassa (D)

Full history

  1. Jan 29, 2016 · Assembly

    Introduced by Representatives Krug and A. Ott; cosponsored by Senator Lassa

  2. Jan 29, 2016 · Assembly

    Read first time and referred to Committee on Environment and Forestry

  3. Mar 16, 2016 · Assembly

    Fiscal estimate received

  4. Apr 13, 2016 · Assembly

    Failed to pass pursuant to Senate Joint Resolution 1