Bills · 2015-2016 Regular Session
Relating to: the preparation of an environmental impact statement for a certain major highway project in Wood County. (FE)
Environmental protection Road — Construction and repair Transportation, department of — Roads Wood county
- Introduced, stopped here
- Passes Assembly, not reached
- Passes Senate, not reached
- Governor signs, not reached
- Law, not reached
Unfamiliar terms? Glossary
What this bill does
Plain-language analysis by the nonpartisan Legislative Reference Bureau
Under current law, the Department of Transportation (DOT) administers a
major highway projects program. With limited exceptions, a major highway project
is either 1) a project having a total cost of more than $30,000,000 and involving a)
construction of a new highway 2.5 miles or more in length; b) reconstruction or
reconditioning of an existing highway that relocates at least 2.5 miles of the highway
or adds one or more lanes five miles or more in length to the highway; or c)
improvement of an existing multilane, divided highway to freeway standards or 2)
a project having a total cost of at least $75,000,000. For both categories of major
highway projects, DOT annually adjusts the total cost threshold based on an
inflation index.
For major highway projects of the first type, the project must generally receive
the approval of the Transportation Projects Commission (TPC) and the legislature
(generally referred to as "enumeration") before the project may be constructed. In
general, DOT must receive authorization from TPC to prepare an environmental
impact statement (EIS) or environmental assessment (EA). Once the EIS or EA is
completed, TPC may recommend approval of the project. After TPC has
recommended a project, the legislature may enumerate the project and construction
of the project may commence.
For major highway projects of the second type, DOT may prepare an EIS or EA
for the project without TPC approval but, prior to construction of the project, must
submit a report to TPC and request TPC approval to proceed with the project under
a passive review process. Once approved by TPC, the project is considered
enumerated as a major highway project under the statutes.
This bill involves a project of the first type. The bill requires DOT to study the
amount of vehicle traffic on a portion of STH 13 and, if the study indicates that the
traffic count on any portion of the study area averages 28,000 vehicles per day, to
commence the preparation of an EIS for a project involving the construction of a
proposed east arterial highway that begins at the intersection of STH 54 and STH
73 in the village of Port Edwards and extends to the intersection of STH 54 and CTH
"W" in the city of Wisconsin Rapids and that includes a new crossing of the Wisconsin
River. The EIS, under this bill, may be prepared without regard to whether TPC has
approved the preparation of the EIS.
Sponsors
Introduced by: Krug (R)
Full history
- Jan 29, 2016 · Assembly
Introduced by Representative Krug
- Jan 29, 2016 · Assembly
Read first time and referred to Committee on Transportation
- Apr 13, 2016 · Assembly
Failed to pass pursuant to Senate Joint Resolution 1