Bills · 2021-2022 Regular Session
Relating to: a charging facility grant program and making an appropriation. (FE)
Motor vehicle Public service commission Transportation department of — Vehicles
- Introduced, stopped here
- Passes Assembly, not reached
- Passes Senate, not reached
- Governor signs, not reached
- Law, not reached
Unfamiliar terms? Glossary
What this bill does
Plain-language analysis by the nonpartisan Legislative Reference Bureau
This bill requires the Public Service Commission to establish an electric vehicle
charging facility grant program. Under the program, PSC, in consultation with the
Department of Transportation, must designate one or more clean energy corridors
consisting of contiguous state trunk highways that connect Wisconsin to Minnesota,
Michigan, Iowa, and Illinois. Also under the program, PSC must award grants to 1)
businesses, electric utilities, and electric cooperatives for installing publicly
accessible electric vehicle charging facilities along the corridor and 2) business not
along the corridor and multiunit dwellings for installing electric vehicle charging
facilities that are not necessarily accessible by the public. The funding source for the
grants is settlement moneys that the state received from a legal action against
Volkswagen. The bill allows PSC to award up to $10,000,000 in total grants under
the program. At least $5,000,000 must be awarded to applicants under item 1) and
at least $3,000,000 must be awarded to applicants under item 2). No grants may be
awarded after June 30, 2027.
Individual grants for applicants under item 1) may not exceed 75 percent, and
for applicants under item 2) may not exceed 50 percent, of the cost to purchase,
install, and maintain an electric vehicle charging facility. The bill specifies that a
person that is awarded a grant and installs an electric vehicle charging facility may
charge a parking fee to any person who uses the facility. The parking fee may be a
flat fee or be based on the amount of time a user is parked near or connected to the
station or on the amount of electricity used.
Also under the bill, PSC must prepare two reports. For the first, PSC must
describe the locations of the charging facilities installed under the charging facility
grant program and of any gaps of greater than 50 miles in charging facility coverage
along clean energy corridors. This report must be provided to the legislature and
DOT. For the second, PSC must provide potential methods of ensuring an equitable
contribution by electric vehicle drivers, as compared to other drivers of passenger
vehicles, to the funding of highways and local transportation aids. In preparing this
report, PSC must consult with DOT, public utilities, and other stakeholders. PSC
must provide this report to the legislature.
What it would cost
Fiscal estimates filed by state agencies, as official PDFs
Sponsors
Full history
- Nov 12, 2021 · Assembly
Introduced by Representatives VanderMeer, Armstrong, Milroy, Oldenburg and Spiros; cosponsored by Senators Cowles and Ballweg
- Nov 12, 2021 · Assembly
Read first time and referred to Committee on Energy and Utilities
- Nov 18, 2021 · Assembly
Fiscal estimate received
- Nov 18, 2021 · Assembly
Fiscal estimate received
- Jan 13, 2022 · Assembly
Assembly Substitute Amendment 1 offered by Representative VanderMeer
- Jan 19, 2022 · Assembly
LRB correction
- Jan 19, 2022 · Assembly
LRB correction (Assembly Substitute Amendment 1)
- Mar 15, 2022 · Assembly
Failed to pass pursuant to Senate Joint Resolution 1