Relating to: the use of reclaimed nonmetallic mining sites for construction of solar projects requiring a certificate of public convenience and necessity or a certificate of authority from the Public Service Commission. (FE)
Energy conservation Mines pits and quarries Public service commission Public utility
- Introduced, stopped here
- Passes Senate, not reached
- Passes Assembly, not reached
- Governor signs, not reached
- Law, not reached
Unfamiliar terms? Glossary
What this bill does
Plain-language analysis by the nonpartisan Legislative Reference Bureau
Current law prohibits a person from beginning construction of a large electric
generating facility (LEGF) unless the Public Service Commission grants a certificate
of public convenience and necessity (CPCN) for the proposed facility. An LEGF is
defined as a facility with a nominal operating capacity of 100 megawatts or more.
In addition, a public utility may not engage in certain construction, expansion, or
other projects unless PSC grants a certificate of authority (CA) for the proposed
project. Current law prohibits PSC from issuing either a CPCN or a CA unless it
determines that brownfields are used to the extent practicable. This bill requires
that, for solar projects, PSC may not issue a CPCN or CA unless it determines that
reclaimed nonmetallic mining sites are used to the extent practicable. The bill
specifies that the reclamation must have occurred no earlier than 2010. Under the
bill, a solar project is the construction or installation of solar photovoltaic panels or
other devices used for collecting solar energy in order to generate electricity.
What it would cost
Fiscal estimates filed by state agencies, as official PDFs
Sponsors
Introduced by: Smith (D)
Full history
- Mar 9, 2022 · Senate
Introduced by Senator Smith
- Mar 9, 2022 · Senate
Read first time and referred to Committee on Natural Resources and Energy
- Mar 15, 2022 · Senate
Failed to pass pursuant to Senate Joint Resolution 1
- Apr 4, 2022 · Senate
Fiscal estimate received