Bills · 2021-2022 Regular Session
Relating to: authorization for metropolitan sewerage districts containing a first class city to finance and construct a dredged material management facility located in the city of Milwaukee. (FE)
Lakes Milwaukee — Sewerage Sanitation and sewerage management
- Introduced, stopped here
- Passes Senate, not reached
- Passes Assembly, not reached
- Governor signs, not reached
- Law, not reached
Unfamiliar terms? Glossary
What this bill does
Plain-language analysis by the nonpartisan Legislative Reference Bureau
This bill allows a metropolitan sewerage commission for a sewerage district
including a first class city (currently only the city of Milwaukee) to finance and
construct a dredged material management facility for the Milwaukee Estuary Area
of Concern at a location in the city of Milwaukee.
The Milwaukee Estuary is one of the “Areas of Concern” across the Great Lakes
identified under the 1987 Great Lakes Water Quality Agreement. The Great Lakes
Water Quality Agreement is an agreement between the United States and Canada
to restore and protect the waters of the Great Lakes. The U.S. Environmental
Protection Agency coordinates U.S. activities under this agreement. The Water
Quality Agreement defines an “area of concern” as “a geographic area designated by
the Parties where significant impairment of beneficial uses has occurred as a result
of human activities at the local level."
Current law allows a metropolitan sewerage commission for a sewerage district
including a first class city to participate in certain shore protection projects, but the
provision does not apply to any project after January 1, 1992. The bill would modify
certain current law requirements, including the date restriction, to specifically allow
the metropolitan sewerage commission to construct projects, including a dredged
material management facility project, before January 1, 2032. Under the bill, the
commission must pay for all the costs of the dredged material management facility
project through its capital budget and may finance the project by issuance of bonds
or notes that must be made payable within 35 years. The bill also provides that the
commission may reserve space in the dredged material management facility for the
disposal of sediment from flood management projects. The bill is contingent upon
the commission adopting a resolution by the end of calendar year 2021 that
establishes a requirement that through 2028, the Milwaukee Metropolitan
Sewerage District's capital budget levy increases will be at or below a six-year rolling
average of three percent.
What it would cost
Fiscal estimates filed by state agencies, as official PDFs
Sponsors
Introduced by: Cowles (R) , Kooyenga (R)
1 cosponsors
J. Rodriguez (R)
Full history
- Jun 14, 2021 · Senate
Introduced by Senators Kooyenga and Cowles; cosponsored by Representative J. Rodriguez
- Jun 14, 2021 · Senate
Read first time and referred to Committee on Natural Resources and Energy
- Jun 22, 2021 · Senate
Fiscal estimate received
- Mar 15, 2022 · Senate
Failed to pass pursuant to Senate Joint Resolution 1