Bills · 2023-2024 Regular Session
Relating to: solar and wind energy projects on prime farmland. (FE)
Energy conservation Farmland preservation Public service commission Public utility
- Introduced, stopped here
- Passes Assembly, not reached
- Passes Senate, not reached
- Governor signs, not reached
- Law, not reached
Unfamiliar terms? Glossary
What this bill does
Plain-language analysis by the nonpartisan Legislative Reference Bureau
Current law prohibits a person from beginning construction of a large electric
generating facility (LEGF) unless the Public Service Commission grants a certificate
of public convenience and necessity (CPCN) for the proposed facility. An LEGF is
defined as a facility with a nominal operating capacity of 100 megawatts or more. In
addition, a public utility may not engage in certain construction, expansion, or other
projects unless PSC grants a certificate of authority (CA) for the proposed project.
Under this bill, PSC may not issue a CPCN or CA for a solar project or wind
project unless it determines that no more than 35 percent of project land is classified
as prime farmland under current state or federal law. The bill defines a solar project
as an area of land on which solar photovoltaic panels or other devices used for
collecting solar energy and any associated equipment and facilities are installed in
order to generate electricity, designed for nominal operation at a capacity of 15
megawatts or more. The bill defines a wind project as an area of land on which
devices used for collecting wind energy and any associated equipment and facilities
are installed in order to generate electricity, with nominal operation at a capacity of
15 megawatts or more.
What it would cost
Fiscal estimates filed by state agencies, as official PDFs
Sponsors
Full history
- Dec 6, 2023 · Assembly
Introduced by Representatives Schraa, Schutt, Behnke, Bodden, Goeben, Krug, Murphy, O'Connor and Mursau; cosponsored by Senator Wanggaard
- Dec 6, 2023 · Assembly
Read first time and referred to Committee on Energy and Utilities
- Dec 18, 2023 · Assembly
Fiscal estimate received
- Apr 15, 2024 · Assembly
Failed to pass pursuant to Senate Joint Resolution 1